Extension of Ratzelstraße between Schönauer Straße and Diezmannstraße in 04207 Leipzig; TO: road, civil engineering, track and overhead line construction
securing public transport during the construction period,
750 m³ layers without binders,
2815.00 m² asphalt road surface,
500.00 m² asphalt walk/bike path,
1015.00 m² mosaic plaster,
2350,00 m² concrete block paving,
260,00 m² large paving natural stone,
1115.00 m gutter made of concrete block paving,
170.00 m² guidance system for the blind,
375.00 m high shelves,
440,00 m deep shelves,
185.00 m round shelves,
600.00 m drainage shelves,
20.00 pcs trays,
28.00 h road drains including pipeline construction,
pioneering signage including plant planning,
other stationary traffic signage and marking work,
Construction of the urban lighting system with 24 light poles including pipeline construction and electrical assembly work,
civil engineering work for utilities,
1300 m³ layers without binders for railway bodies and track quentations,
2,900 m² concrete track plate,
736 m double track - Rheda City covered,
27 m double track - open crosssleeper track,
1 single branch,
2 pieces of simple turnouts,
4 pairs of transition rails 49E1/60R2,
2 track lubrication systems incl. pump cabinets,
4,560 m² asphalt load/surface layers for railway bodies and track quentations,
install 40 m² paving ceiling,
set 93 m curbs,
92 m cape stop with raised cycle lane incl. station board,
2 pieces DFI,
2 passenger shelters,
4 benches 3-seater sofa set,
produce 300 m of seeping,
110 m box channel,
40 rail drainage boxes,
106 m box gutter,
6 track drainage boxes,
220 m connection cables DN150,
construction-time signalling system for single-track section 500 m,
2 construction switches,
2 built-time platforms in Diezmannstraße,
8 borepipe foundations for catenary masts,
3 concrete catenary masts,
5 combined masts overhead line - LSA- public lighting including plant planning,
Approx. 1900 m chainwork overhead line,
approx. 300 m single overhead line,
15 cable bays,
approx. 1600 m thermowellen route including civil engineering,
Approx. 300 m cable trench for cable laying,
4 pcs tree planting incl. planting pit,
13 pcs shrubs,
350,00 m² lawn seeding,
3 years of completion and development maintenance