Wave Hub are planning the installation of 4 No 33kV rated cable tail extensions from the current dry mate connectors to four developer berths offshore Hayle, Cornwall. This scope details the Installation requirements to replace the current 11kV rated dry mate connectors with 33kV rated in-line joints, install four new lengths of cable tails and to terminate the extension cables with half of a 33kV dry mate connector.
Services required for the installation of 4 No 33kV rated cable tail extensions from the current dry mate connectors to four developer berths offshore Hayle, Cornwall. To include replacement of current 11kV rated dry mate connectors with 33kV rated in-line joints, installation 4 new lengths of cable tails and termination of the extension cables with half of a 33kV dry mate connector.