The Verbandsgemeinde Monsheim is building a sports and multi-purpose hall as a three-field hall in Monsheim. In the one to two storey building with a total of approx. 4,299 m
The subject of this tender is the implementation of the air conditioning with building technology.
- 1 piece ventilation unit 27,000 m³ / h with heat recovery and base frame;
- 1 unit ventilation unit 13,000 m³ / h with heat recovery and base frame;
- 2 units ventilation unit 3,000 m³ / h with heat recovery and base frame;
- 2 pc exhaust fans 2,000 m³ / h;
- 2 pc. Plastic fans 250 m³ / h 1 900 m
- 60 pcs air outlets 1,200 m
- 12 volume flow controllers with accessories, axb = 700 x 500;
- 20 volume flow controllers DN 100 - 315;
- 31 fire dampers 900 running meters Ventilation pipes with molded parts u. Accessories DN 100 - DN 560;
- 3 pieces of control cabinets for heating and ventilation with installation work;
- 3 automation stations for heating and air conditioning;
- 190 pieces of field devices for heating and ventilation systems with lay-up work. Mobile platforms for assembly. Crane positions for transport.