Electricity delivery free Acceptance point for a contract period of 4 years (2020 to 2023), each with a termination option for the 3rd and 4th contract year. The total volume for the delivery year 2020 is approximately 47.1 GWh / a divided into 2 lots, for 115 RLM points of sale (about 44.3 GWh / a), 114 SLP points of sale (about 2.8 GWh / a) , The total volume for the delivery year 2021 is approximately 47.7 GWh / a divided into 2 lots, for 114 RLM points of sale (about 44.8 GWh / a), 116 SLP delivery points (about 2.9 GWh / a) , The total volume for the optional delivery years 2022 and 2023 is approximately 47.7 GWh / a, divided into 2 lots for 114 RLM points of sale (approximately 44.8 GWh / a), 115 SLP delivery points (approximately 2.9 GWh / a). The delivery points are nationwide in about 69 network areas. More detailed information can be found in the tender documents.
Supply of electricity for the delivery years 2020 to 2023
- at each of 115 electricity purchase points for a total of approx. 44.3 GWh / a for the delivery year 2020,
- to 114 electricity collection points totaling approx. 44.8 GWh / a for the delivery years 2021 to 2013.
The are supplied on medium voltage and low voltage level. All delivery points are 1 / 4h-metered. The 1/4 h load values over 1 year are provided electronically. Access to the master, consumption and load profile data is made possible after the signed confidentiality declaration has been submitted (you can find the corresponding form in the tender documents).
The clients place the ecological requirement that at least 50% of the electricity to be supplied must come from renewable energies. It is necessary to submit a self-declaration on the ecological requirements for the lot (you can find the corresponding form in the tender documents). Furthermore, with the offer, a concept for communication between client and contractor must be submitted. Further details can be found in the tender documents.
Supply of electric current for standard load profile customers for the delivery years 2020 to 2023
- at each of 114 electricity purchase points for a total of approx. 2.8 GWh / a for the delivery year 2020,
- at each of 115 electricity purchase points totaling approx. 2.9 GWh / a for the delivery years 2021 to 2013.
The standard load profiles over 1 year are provided electronically. Access to the master, consumption and load profile data is made possible after the signed confidentiality declaration has been submitted (you can find the corresponding form in the tender documents).
The clients place the ecological requirement that at least 50% of the electricity to be supplied must come from renewable energies. It is necessary to submit a self-declaration on the ecological requirements for the lot (you can find the corresponding form in the tender documents). Furthermore, with the offer, a concept for communication between client and contractor must be submitted. Further details can be found in the tender documents.