Earthwork, hydraulic engineering and traffic route construction works.
Quantities:
- Surface work approx. 420 m
- Soil excavation approx. 350 m
- Floor installation approx. 600 m
- curbs and gutters approx. 220 m;
- angle brackets approx. 50 m;
- Paving approximately 730 m
- asphalt work approx. 440 t;
- cable conduits approx. 90 m;
- hydraulic building pavement approx. 200 m
- Concrete foundations approx. 12 m
- Mobile flood protection wall, H = 0.50 m approx. 18 m.