Grundhafte Fahrbahnerneuerung
As part of the measure, the L 125 will be fundamentally renewed over a length of approx. 2.5 km between Nortorf (L328) and Bargstedt in a construction class BK10 (RStO) with a lane width of 7 m (road superstructure). 50,000 m³ of peat must be removed underground, reused on agricultural land and replaced by coarse-grained material corresponding to ZTV E (earthworks). Supply of the residents with electricity, water, gas and telecommunications must be ensured during the construction period and moved to the final location at the end of the construction project.