The construction project includes the conversion of the listed building G to a medical center. The complete renovation according to the requirements of fire protection, monument protection, statics and building physics is provided. The measure mainly comprises the reorganization of the layout of the floors and the complete renewal of the operational facilities as well as extensive fire protection measures.
- About 500 m
- 1 piece SW lifting system,
- 4 pieces SW-shafts,
- approx. 50 m waste water channel PVC-U,
- approx. 20 m pressure pipeline drinking water supply,
- approx. 80 m plastic jacket pipe heating DN 80,
- approx. 40 m plastic jacket pipe cold DN 100.