undertakings
The district office Neustadt/Aisch – Bad Windsheim is to be renovated. At the same time, there is a shortage of land because the number of
In the course of ever new tasks, jobs have grown. The initial task was based on an ideal spatial programme.
to examine the maximum capacity in the portfolio, taking into account the functional relationships of the individual subject areas, in order to:
to find out which areas are not accommodated in the stock and therefore have to be cultivated. 7 different
Area distributions were investigated. Once the need for cultivation had been clarified, the task was to be examined in the following:
which places the building mass generated from the surfaces can be placed. For this purpose, 6 different arrangements were examined.
Two orders were deepened and presented to the district council with a cost estimate. For the remaining
Finally, the arrangement of the building mass was the energy standard and the construction method in different variants and
Combinations with each other and submitted to the district council for decision. (4 energy standards, 3 construction methods) The
The energy standard and the construction method were transferred to the further planning phases. The old building is built in its external form with
Perforated windows and larger façade parts remain largely the same in alternation. There will be a contemporary colorfulness of the windows
envisaged. With an ETICS for energetic upgrade, the plaster look is retained in structure and color.
Under the premises of a technical and organizational maintenance of the administrative operation in the existing building, the
Construction of component D as the first construction phase - which is the subject of this specification - the result. The completed
Construction phase 1 will then serve as a marshalling yard for the following further construction phases of the general renovation of the existing building, which will be carried out in the
will be the subject of further procurement procedures in the coming years.
location
The district office is centrally located in Neustadt/Aisch to the schools south of the old town centre. The marketplace is divided into ten
Minutes walking distance. A bus stop is located near the building.
SLN-H09 Metallbauarbeiten - Stahlrohrrahmentüren
- 17 pieces of steel raw frame interior door elements, some in T30 design
- 6 pieces of sheet steel door elements, some in T30 and T90 design