The construction site of the open spaces surrounds the new wooden multi-storey car park at Schwanenplatz. Direction
To the south, a small entrance square is to be created, which will expand in further construction phases up to the
Schwanenplatz. This is where most of the lines run and it is
there is a transformer in the southern area. Access to the wooden multi-storey car park opens up
also from the Schwanenweg in the south. The façade of the wooden multi-storey car park is to be
climbing plants. These are ground-based in the open spaces.
The rainwater from the roof areas of the multi-storey car park is drained away in 8 downpipes, 6
of which will be used in the lawns in retention hollows to the west and east of the multi-storey car park.
introduced. 2 are fed into a cistern so that the tree trenches are watered.
A total of 8 trees will be planted within the cultivation area.
In the forecourt, two green islands will be created, in which perennial planting is planned.
The following must be created:
A.) Access roads and road connections
B.) Green areas not underbuilt
C.) All planned plantings
Creation of the outdoor area at the multi-storey car park: paths, sewage and water systems, planting and saturating areas, lawns and seeding, façade greening, etc.