The existing elementary and regular school is to be brought together on a “campus”. For this reason, a part of the building will be added to the existing regular school. The primary and regular school rooms including administration, canteen, auditorium and other central functions are to be accommodated in this.
The 03 – Dachabdichtungsarbeiten
Overview of services
- approx. 1,700 m² bitumen-based primer and vapour barrier on cleaned surface underlay
- ca. 1.500 m² Grunddämmung EPS, d= 160mm
- ca. 1.250 m² Gefälledämmung EPS, d= 20-220mm
- ca. 135 m² Grunddämmung MW, d= 140mm
- ca. 110 m² Gefälledämmung MW, d= 40-200mm
- ca. 1.400 m² Flächenabdichtung FPO
- approx. 470 m² surface waterproofing FPO siding
- approx. 260 m parapet sheet metal cover incl. substructure, connections, corner formations
- 12 parapet drains, main emergency combi
- approx. 130 m drainage pipe DN 100 incl. fittings
- approx. 120 m drain pipe DN 50 incl. fittings
- 2 flat roof windows 150x150cm incl. curf, SHEV, smoke detector
- 8 individual attachment points dm= 42/16mm
- approx. 50 m lifeline system dm= 8mm, passable/not passable
Execution period: approx. CW 21, 2024 to CW 48, 2024