Electrical engineering installation works | Tenderlake

Electrical engineering installation works

Contract Value:
-
Notice Type:
Contract award notice – utilities
Published Date:
24 December 2021
Closing Date:
Location(s):
IE IRELAND
Description:
Electrical Balance of Plant (EBOP) Contract for Oweninny Phase 2 Wind Farm

Oweninny Power 2 DAC, the Contracting Entity , is a joint venture company formed between Bord na Móna Energy Ltd and ESB Wind Development Ltd. Oweninny Power DAC has developed the first phase of a Wind Farm at Oweninny, Bellacorick, Co. Mayo. The Contracting Entity now intends to procure works, supplies and services related to electrical balance of plant (EBOP) for the Oweninny Phase 2 wind farm project.

Oweninny Phase 2 wind farm is an 83MW project located adjacent to the existing 89MW Oweninny Phase 1 Project. The Contracting Entity plans to develop the phase 2 project commencing in 2020.

The Contracting Entity intends to procure works, supplies and services related to electrical balance of plant for the Oweninny Phase 2 wind farm project.

The scope of work for Contract shall include the design, procurement and installation for the following non-exhaustive list, however tenders should note that the detailed scope and contracting strategy will be determined at tender stage:

1. EBOP Civil Works

2. Earthing System for complete station and OEM plant areas

3. Auxiliary Power Supplies

4. Mechanical & Electrical Services

5. Grid connection works – underground cable or overhead line as required

6. HV End Masts or Cable Connection terminations

7. Grid Transformer

8. Neutral Earthing Resistor

9. MV Cable MV Cable Network

10. MV Switchgear MV Switchgear

11 Connection of Main LV and Standby supply

12. Fibre Optic Cable Network

13. Control & Protection as per Employers specifications

14. Connection to Revenue Metering

15. Installation and Wiring of OEM Cabinets

16. Installation and Wiring of Employers SCADA Cabinets

17.. Studies if specified

18. Design Process & Procedures

19. Testing and commissioning

20. Implementation of Employers Electrical Transfer Procedures including SAP

21. Operations & Maintenance requirements

22. Permanent Telecommunications for site

23. Fulfilling role of PSCS or Principal Contractor during all or part of the Works, which may include other parties on site

24. Met mast procurement and erection if required, including foundation and crane hardstanding

Some post construction works/services during the project operational phase may also be included in the scope of the Contract.

Awarded to:
Electrical Balance of Plant (EBOP) Contract for Oweninny Phase 2 Wind Farm
H&MV Engineering Ltd, Limerick (IE)
Download full details as .pdf
The Buyer:
Oweninny Power 2 DAC
CPV Code(s):
45315100 - Electrical engineering installation works
45317200 - Electrical installation work of transformers
45317300 - Electrical installation work of electrical distribution apparatus
71314100 - Electrical services
71323100 - Electrical power systems design services