Construction of a control cabinet and control technology for heating and ventilation,
Extension of the primary school in Stöckheim.
Scope:
- Heating distribution with 4 heating circuits
- Supply and exhaust air system kitchen
- Drinking water heating
Construction of a control cabinet and control technology for heating and ventilation,
Extension of the primary school in Stöckheim.
Scope:
- Heating distribution with 4 heating circuits
- Supply and exhaust air system kitchen
- Drinking water heating