The present project, new integral child centre de Tjalk, consists of a building to replace 2 school buildings and includes a school for primary education, a childcare (together an IKC), a games room and gym, total with a size of approximately 2500 m2 gfa. The existing school building has already been demolished, the new school will have to be built at this location. The construction site after demolition has remained. Before the start of construction, the site must be prepared for construction. The design of the outdoor space does not fall within the scope of the project, but in terms of coordination and coordination.
Realization new building IKC De TjalkThe task-setting budget for the Assignment is set at a maximum
€ 7.100.000,00 (exc. VAT)