New construction of the complete process and ESMR technology for the new kiln lines 10 and 20 in the Schwandorf waste-to-energy plant
In accordance with the tender documents, the subject matter of the contract includes all deliveries and services for the renewal of the process and ESMR technology of kiln lines 10 and 20 that are required for operational construction.
1. The design and supply of all components, parts, aggregates, equipment and pipelines required for the construction and operation of the waste treatment plant and its complete connection to the interfaces. These essentially include: firing and boilers, flue gas cleaning, technical building alignment, construction technology (building construction), relocations and temporary arrangements as well as EMSFD technology;
2. The scope of services includes all services that are required from the placing of the order to the acceptance of the defect-free system. These are in particular:
o the integration into the overall plant as turnkey plants, the commissioning, trial operation and handover of the plant mentioned under 1;
o the sufficient technical and organizational training and instruction of the client's operating personnel ("AG" or "ZMS") as well as
o Comprehensive documentation.
The deliveries and services are carried out as part of the overall "Triphönix" project by the contractor ("contractor") as partial general contractor (GC).