For a planned hospital extension, drinking water, brine, district heating and sewage pipes must be relocated as preliminary measures.
- approx. 550 m
- approx. 100 m cable clamps ELT, drinking water, brine pipes,
- approx. 265 m of pipes KGEM-PP, SN 8, with branches, bends, sleeve sleeves, etc.,
- approx. 8 prefabricated concrete manholes,
- approx. 160 m pressure pipes PE 100 with bends and reducers etc.,
- approx. 89 welding sleeves PE- HD,
- approx. 260 m composite jacket pipe, buried, inner pipe steel, as heating pipe,
- approx. 165 m underground cables,
- approx. 330 m pressure test of various diameters, plastic, steel,
- approx. 180 m pressure test drinking water pipe,
- approx. 1 piece of dismantling sanitary installations, approx. 70 m,
- approx. 1 piece of dismantling heating installations, approx. 280 m,
- Approx. 70 m stainless steel pipelines DN 65, cold / warm water including accessories and insulation.