Services for building physics, work phases 1 to 7 according to Appendix 1 section 1.2.2 to § 3 (1) HOAI 2021 for the following project:
The city of Flensburg acquired the almost 500 m² Angelburger Str. property at the beginning of 2022 and is planning to modernize and repair it in accordance with urban development funding regulations. Due to the condition of the building, considerable modernization costs can be expected to be unprofitable. The possibility of funding for urban development exists, as the building complex was classified as a complex with a high need for modernization in the preparatory studies of the Western Old Town redevelopment area.
Angelburger Str. 15 follows the structural scheme of the merchant's courtyards. The order comprises the front building with a solid front building and two structurally separate frame structures adjoining the north, as well as two side wings that adjoin the three-section front structure and are staggered in height.
Services for building physics, work phases 1 to 7 according to Appendix 1 section 1.2.2 to § 3 (1) HOAI 2021 for the following project:
The city of Flensburg acquired the almost 500 m² Angelburger Str. property at the beginning of 2022 and is planning to modernize and repair it in accordance with urban development funding regulations. Due to the condition of the building, considerable modernization costs can be expected to be unprofitable. The possibility of funding for urban development exists, as the building complex was classified as a complex with a high need for modernization in the preparatory studies of the Western Old Town redevelopment area.
Angelburger Str. 15 follows the structural scheme of the merchant's courtyards. The order comprises the front building with a solid front building and two structurally separate frame structures adjoining the north, as well as two side wings that adjoin the three-section front structure and are staggered in height. Due to prolonged clearance of buildings and neglect, the merchant's yard is in a very poor condition. Due to the ongoing deterioration of the building fabric
Apr 12, 2022
In the meantime, the buildings that were not stable had to be secured with static building aids.
The building as a whole has an exceptionally high level of historical preservation significance for the city of Flensburg and is a listed building. The front part of the front building probably dates from a time before 1551 and thus underlines the special architectural significance of the merchant's court. It is the second-oldest dated town house in the southern old town and the oldest half-timbered building in the district. The farm character is well preserved. Services for building physics in the service phases 1-7 according to Annex 1 Section 1.2.2 to § 3 (1) HOAI 2021 are to be awarded as a phased contract for the modernization and repair of Angelburger Straße 15 in accordance with the regulations of urban development law. In order to be able to raise funding for the construction of Angelburger Straße 15 as part of the Schleswig-Holstein urban development promotion, the necessary conditions must first be created in service phases 1-3 (1st stage) and application documents must be prepared. A modernization and repair study examines the basic feasibility and eligibility of the project and forms the basis of the qualified funding application for the modernization measure for submission to the Ministry of Interior, Rural Areas, Integration and Gender Equality of the State of Schleswig-Holstein. The development of the work phases 4-7 (stage 2) is carried out after the country has made a positive decision on the use of funds. The 1st stage contractor is not entitled to transfer stage 2.