Renovation of the outdoor swimming pool in Esslingen-Berkheim:
The NRF is about 1 870 m
The following measures are to be implemented in the course of the upcoming refurbishment:
- total renovation of the inner and outer pools (stainless steel lining),
- Renovation of the foyer, changing room and sanitary area,
- Complete renewal of technical building installations (heating, ventilation, sanitary, electric and bathing water technology),
- barrier-free access,
- energetic upgrading of the building envelope.
The work is expected to start in September 2019 - May 2021.
- PIR parallel insulation 160 mm - approx. 1 210 m
- PIR slope insulation iM 125 mm - approx. 880 m
- RPTF insulation boards 20 mm - approx. 880 m
- attic elevation (wooden stand) - approx. 210 running meters,
- Film sealing with photovoltaic - approx. 335 m
- Film sealing without photovoltaic - approx. 870 m
- Protective membrane foil roof - approx. 450 m
- fall protection system - 4 x psch,
- Roof edge end profile - approx. 225 running meters