Painting work as part of the replacement of the new building and the renovation of the Ludgerischule
First painting of approx. 2100 m² wall area made of plasterboard and interior plaster and approx. 1650 m² ceiling surfaces made of smooth and perforated plasterboard, as well as the filling of Q2 surfaces on Q3 surfaces on walls and ceilings. In addition, about 70 lfm of railings have to be painted. Furthermore, about 1200 m² of wall surfaces in the existing building have to be revised with existing coatings and recoated.