Preparatory work and site installations for the La Barthe dam emptying project.
The contract for preparatory works and site installations for the La Barthe dam emptying project consists of:
- the organisation of all logistics around the overall project (common living base, tower crane on the La Barthe dam, temporary access and construction lift on the La Barthe dam) from 2025;
- carrying out the preparatory work necessary to guarantee the emptying of 2026 (GC works on the threshold of the Cadène, access ramp in the Cadène reservoir, device for the return of the reserved flow of 2 m3/s, etc.).