The total gross area of the project is approx. 54 600 m
Contract K401 mainly includes all buildings parts in chapter 4: Electric Power. Some building parts from Chapter 5: Telecommunication and automation, Chapter 6: Other installations and Chapter 7: Outdoor installations, will also be included in the contract.
The Electric power technical systems include a total of 8 different contracts that will be published as separate tender contests. K4011 Lighting (including outdoor), K501 Security, K5011 Network, K502 Central Operation/Automation, K503 ICT equipment, K5031 AV equipment and K601 Lifts (Contract K601 Lifts is contracted).
Some Electric power technical works that are included in contract K201; Alteration Infrastructure, K204; Framework concrete works and K701 Outdoor installations will also be included.
Contract K401 will have an interface towards most of the project's contracts. E.g interface towards K209; Doors, K207; Internal works 2, K302; Ventilation, K301; Pipes, and K206; Internal works 1.