Flood protection measures M1.14 at the Zwönitz in Burkhardtsdorf, VGE 1.14 D
M 1.14/11 left-sided inlet with pumping station
approx. 150 m² installation
ca. 21 m Fangedamm
approx. 200 m³ construction road
approx. 465 m³ excavated earth
ca. 150 m³ Flüssigboden
approx. 4 core holes up to DN500
ca. 1 St. Sonderschachtbauwerk
approx. 61 m reinforced concrete duct in various dimensions
ca. 12 m duktiles Gussrohr DN 400
approx. 1 shaft DN 1.200
approx. 2 pcs. stationary flood pumps incl. control technology
ca. 66 m² Asphalttragschicht
ca. 66 m² Splitmastixdeckschicht
ca. 58 m² Betonpflaster
approx. 55 m Borde tlw. Deliver and move
ca. 55 m² Natursteinpflasterfläche
approx. 240 m² topsoil
ca. 42 m Stahlgitterzaun
ca. 1 St. Industrietor
approx. 68 m² set pack made of hydraulic building blocks