Engineering design services | Tenderlake

Engineering design services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
28 October 2022
Closing Date:
30 November 2022
Location(s):
PL218 Nowosądecki (PL Poland/POLSKA)
Description:
Development of design documentation for the reconstruction of the S/C gas network in Ropa, Gorlice district

The subject of the contract is the development of design documentation for the reconstruction of the gas network

S/C in Ropa, Gorlice district. The project should be developed according to Technical Conditions No: PSGKR. ZMSZ.763.1109501.1.22 of 14.07.2022, issued by Polska Spółka Gazownictwa Sp. z o.o., Oddział Zakład Gazowniczy w Krakowie.

1. The Ordering Party entrusts, and the Contractor undertakes to carry out a construction and executive design for the reconstruction of the existing S/C gas network in Ropa, Gorlice district and to exercise author's supervision, which together will be the subject of the Agreement (Subject of the Agreement).

2. The Contractor is obliged to read the "General Terms and Conditions of Contracts Executed for Polska Spółka Gazownictwa sp. z o.o." of 28.03.2022. (GTC), available on the Ordering Party's website at www.psgaz.pl, in the tab: For the contractor / Downloads. The Contractor declares that he has read the GTC before the conclusion of the Agreement, does not raise any objections to them and accepts them in full. The Parties confirm that the GTC are an integral part of the Agreement. In the event of discrepancies between the provisions of the Agreement and the GTC or other annexes, the provisions of the Agreement shall prevail, subject to § 12 of the GTC.

3. The subject matter of the Agreement shall cover in particular:

1) the implementation of the construction project, the executive and the object of the works:

a) reconstruction of the existing S/C gas network into PE dn 160, PE dn 90, PE dn 63, PE dn 25 with a total length of 10134m, hereinafter referred to as the Project,

2) obtaining all required opinions, permits and decisions, including obtaining in the name and on behalf of the Ordering Party, from the competent authority, the final decision on the building permit or submitting a notification in the name and on behalf of the Ordering Party of the intention to commence construction works or construction that do not require obtaining a building permit,

3) execution of investor cost estimates,

4) exercise copyright supervision.

4. Detailed scope of work:

• Execution of construction, executive design and bill of quantities for the reconstruction of the existing S/C gas network in Ropa, Gorlice district. The project should be developed according to Technical Conditions No: PSGKR. ZMSZ.763.1109501.1.22 of 14.07.2022, issued by Polska Spółka Gazownictwa Sp. z o.o., Oddział Zakład Gazowniczy w Krakowie.

• Development of projects for the reconstruction of buildings interfering with the designed gas network

(including, but not limited to: roads, pavements) required by appropriate decisions and arrangements.

• Making the necessary arrangements (and/or obtaining decisions, resolutions) with utilities users, owners of land, real estate or competent public administration bodies.

• Agreement with the relevant services, institutions, location offices, conditions for land occupation, restoration, etc. and obtaining the necessary administrative decisions in this respect, if such are required for the implementation of the Agreement.

• If necessary, agree on the designed objects in the conservation zone or nature protection zone.

• Obtaining by the Contractor other decisions and arrangements, including at the coordination meeting, which are required by law and necessary to obtain the final building permit or notification of the commencement of works, to which the authority has not objected, in order to enable the implementation of the planned investment.

• Obtaining for and on behalf of the Ordering Party the final decision on the building permit or notification of the commencement of works, to which the authority has not objected.

A detailed description of the Subject of the Agreement and the Contractor's obligations is contained in the Description of the Subject of the Contract (OPZ) constituting Appendix No. 1 to the Agreement and Technical Conditions No. PSGKR. ZMSZ.763.1109501.1.22

of 14.07.2022 constituting Appendix No. 2 to the Agreement.

Download full details as .pdf
The Buyer:
Polska Spółka Gazownictwa sp. z o.o. Oddział Zakład Gazowniczy w Krakowie
CPV Code(s):
71248000 - Supervision of project and documentation
71320000 - Engineering design services
71322200 - Pipeline-design services