Construction of a new sewage pipe for the drainage of a ward block up to the existing public sewer
1. Pipelines (cut-and-cover construction)
- approx. 50 m PP pipe DN 200, SN 10, depth up to 3.00 m
- 4 precast concrete shafts, depth up to 3.50 m
- 3 pcs precast shaft made of PP, depth up to 7.00 m
2. Horizontal directional drilling method (closed design)
- rd. 120,00 m PE-HD, SDR 11, DA 250 x 22,7 mm
3. Oberflächenarbeiten
- rd. 150,00 m
- rd. 150,00 m