Faculty of Veterinary Medicine Oberschleissheim,
OSH_ErschlC2, access to Campus 2
Construction work:
- Construction site equipment: construction power and construction water supply line, construction fence (approx. 200 meters), mobile toilet, accommodation and storage container with provision for the entire construction period.
- Earthworks: topsoil removal (approx. 1,185 m2), soil removal (approx. 1,200m3), excavation, point and strip foundations (225 m3), soil disposal and soil installation.
- Reinforced concrete works: formwork, in-situ concrete XC2 individual foundations (approx. 22 m3) and strip foundations (approx. 20 m3), reinforcement (approx. 3.5t) and base - precast reinforced concrete elements (approx. 58 m2).
- Grounding system: ring earth (160 m), foundation earth (approx. 90 m), documentation and measurement.