The Lusatian and Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH (LMBV), intends to build a pipeline for the transport of tailings salt solutions from the Menteroda Mine of the former Volkenroda Mine from the Menteroda Stacking Basin to the central Laugenstapelbecken Wipperdorf.
The pipeline line has a length of 13.575 km from the Menteroda stacking basin to the connection shaft at Sollstedt.
In this route section a total of 9 closed crossings with priority paved traffic areas (5 pcs.), 3 receiving waters (Helbe / Wipper) as well as an extreme height jump on the fertilized by means of controlled HDD method to overcome.
The Lusatian and Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH (LMBV), intends to build a pipeline for the transport of tailings salt solutions from the Menteroda Mine of the former Volkenroda Mine from the Menteroda Stacking Basin to the central Laugenstapelbecken Wipperdorf.
The pipeline line has a length of 13.575 km from the Menteroda stacking basin to the connection shaft at Sollstedt.
In this route section a total of 9 closed crossings with priority paved traffic areas (5 pcs.), 3 receiving waters (Helbe / Wipper) as well as an extreme height jump on the fertilized by means of controlled HDD method to overcome.