Suspended ceilings.
- The work on suspended ceilings is carried out in 3 construction stages, staggered in time and covering a total area of approx. 11,980 m
- Cruciate ligament grid system metal micro-perforated F0 - approx. 3 320 m
- Installation of cruciate ligament grid system metal microperforated F30 - approx. 160 m
- Kreuzbandraster system ceilings mineral wool panels F0 - 7 670 m
- Kreuzbandraster system ceilings mineral wool panels F0 acoustically effective - 560 m
- Smooth plasterboard ceilings F30 - approx. 105m
- Disassembly and reassembly of panel ceilings inventory F0, partial renovation - approx. 35 m
- Remounting lattice ceilings existing - approx. 250 m
- Hanging system ceilings metal F0 outdoors - approx. 130 m
- fire protection measures,
- Panel partitions F90 of ceiling openings of various types and sizes - total. approx. 2060 pieces,
- Linear panel partitions as wall closings F90 - approx. 300 m.
This procedure is under the allocation no. 20-97448. (Please specify when making inquiries).