in accordance with the provisions of Article R.2431-5 of the Public Order Code, the project manager carries out the basic mission elements for a building rehabilitation operation, namely: - aVP: Pre-project studies; - pRO: Project studies; - aCT: Assistance for the award of the works contract(s); - vISA: Examination of compliance with the project and approval of the execution studies carried out by the holder(s) of the works contract(s); - dET: Direction of the execution of the works contract; - aOR: Assistance during reception operations. In addition to the basic mission, the prime contractor will also carry out the following additional mission elements, the detailed content and modalities of execution of which are set out in the CCTP: - dIAG: Diagnostic studies; - oPC: scheduling, control, coordination; - cSSI: Fire Safety System Coordinator
in accordance with the provisions of Article R.2431-5 of the Public Order Code, the project manager carries out the basic mission elements for a building rehabilitation operation, namely: - aVP: Pre-project studies;- pRO: Project studies;- aCT: Assistance for the award of the works contract(s);- vISA: Examination of compliance with the project and approval of the execution studies carried out by the holder(s) of the works contract(s); - dET: Direction of the execution of the works contract;- aOR: Assistance during acceptance operations. In addition to the basic mission, the prime contractor will also carry out the following additional mission elements, the detailed content and execution modalities of which are set out in the CCTP - dIAG: Diagnostic studies;- oPC: Scheduling, Piloting, Coordination;- cSSI: Fire Safety System Coordinator