The construction project is the general renovation of the primary and secondary school in
Höchstädt (Danube). This building is the part of the building from the 60s and its extension from the 90s.
Both parts of the building have a basement and extend
over a total of 4 floors. (KG, ground floor, 1st floor, 2nd floor)
LV 311 Gerüstarbeiten
Site equipment:
-construction site facility
Scaffolding:
- Flächengerüst 2.200 m²
- Extension of scaffolding 51,000 m²/week
- Gerüstkonsole 2.200 m²
- Stair tower 4 pcs
- Freight elevator 1 h