the mission of OPC concerns the following works: Construction of a school group with a useful surface area of approximately 2,870m² on the site of the current elementary school. The future buildings will house the premises of the elementary school (11 classes), the nursery school (6 classes), the leisure center for about 120 children and the catering area that will be sized to produce about 240 meals per day. The work will be carried out in 2 phases specified in the regulation of the consultation.This work is currently valued at 6 000 000 euros (s) Ht and could include 15 separate batches.The OPC will intervene during the phases conception, preparation of the site, execution of the works, acceptance of the works and perfect completion. forecast the mission should start in April 2022
the mission of OPC concerns the following works: Construction of a school group with a useful surface area of approximately 2,870m² on the site of the current elementary school. The future buildings will house the premises of the elementary school (11 classes), the nursery school (6 classes), the leisure center for about 120 children and the catering area that will be sized to produce about 240 meals per day. The work will be carried out in 2 phases specified in the regulation of the consultation.This work is currently valued at 6 000 000 euros (s) Ht and could include 15 separate batches.The OPC will intervene during the phases conception, preparation of the site, execution of the works, acceptance of the works and perfect completion. forecast the mission should start in April 2022