Ventilation installations Execution period 2.9.2019 - 28.8.2020
Ventilation installations Execution period 2.9.2019 - 28.8.2020
- 1 St. RLT system "Output kitchen" (2 400 m³ / h) as a floor-mounted combi appliance with integrated heat recovery and PWW heating coil with inlet and / outlet air outlets, exhaust hood, silencers, ducts approx. 35 m
- Extractor systems WC`s / Nebenräume as 154 St. Individual room fan with WFR approx. 300 m, etc.
- 3 air conditioning units for server and technical rooms consisting of outdoor unit (4.2 kW) and indoor unit for wall mounting with accessories,
- Chemical cabinet exhaust air system (620 m