Engineering works and construction works | Tenderlake

Engineering works and construction works

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
22 March 2022
Closing Date:
25 April 2022
Location(s):
PL432 Zielonogórski (PL Poland/POLSKA)
Description:
Implementation of Contract I under the Project: “Ordering the management of rainwater in the Zielona Góra agglomeration area — stage I”

The subject of this order is the implementation of the Contract I: “Construction of a retention and spreading tank at Foluszowa Street”. As part of the contract, a retention tank will be made on the Link Channel, located on Foluszowa Street in Zielona Góra. The reservoir is located on the left-bank by-streak of the Link Channel, between km 13+311 (outlet from the reservoir) and the side overflow in km 1+546. Link Channel is one of the main receivers of rainwater from Zielona Góra, and the designed tank will be used to transform the wave The watershed in the course after the occurrence of rains in the catchment of the course.

Implementation of Contract I under the Project: “Ordering the management of rainwater in the Zielona Góra agglomeration area — stage I”

The subject of this order is the implementation of the Contract I: “Construction of a retention and spreading tank at Foluszowa Street”. As part of the contract, a retention tank will be made on the Link Channel, located on Foluszowa Street in Zielona Góra. The reservoir is located on the left-bank by-streak of the Link Channel, between km 13+311 (outlet from the reservoir) and the side overflow in km 1+546. Link Channel is one of the main receivers of rainwater from Zielona Góra, and the designed tank will be used to transform the wave The watershed in the course after the occurrence of rains in the catchment of the course.

The subject of the contract includes:

1) demolition of objects of inactive wastewater treatment plant - sandpit, settlers, pumping station, fermentation chamber, sludge drying boards, etc.,

2) construction of the canopy of the tank and the inlet structure for the reservoir, the piling-drain structure and the drainage duct to the receiver - Link Channel,

3) construction of the cleaning device above the tank — two-chamber sandbox,

4) construction of two exits from the public road and access road to the sandbox,

5) demolition of the existing and construction of a new side transfer on the Link Channel and the degree behind the transfer,

6) felling of trees and shrubs interfering with investment,

7) construction of the river bed of the Link Canal on the designed by-streak,

8) construction of the reinforcements of the existing river bed of the Link Canal above the side overflow and the outlet from the reservoir.

The contract is implemented within the framework of the Project “Ordering the management of stormwater in the Zielona Góra Agglomeration Area — stage I” co-financed by the European Union by the Cohesion Fund under the Operational Programme Infrastructure

and Environment 2014-2020.

Download full details as .pdf
The Buyer:
"Zielonogórskie Wodociągi i Kanalizacja" Sp. z o.o.
CPV Code(s):
45220000 - Engineering works and construction works