Port of Dover Maintenance Dredging 2024-2028 | Tenderlake

Port of Dover Maintenance Dredging 2024-2028

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
21 February 2024
Closing Date:
15 March 2024
Location(s):
UKJ SOUTH EAST (ENGLAND) (UK UNITED KINGDOM)
Description:
Maintenance dredging works at Port of Dover to restore depths in harbours and docks, using trailing suction hopper dredger, with sediment classified as fine sandy silt and disposal at designated offshore site.
Port of Dover Maintenance Dredging 2024-2028.
The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt.
With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010.
Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor.
Pre-dredge surveys to be carried outby Employer using a multi-beam echo sounder, resulting in near total seabed coverage, intermediate or during dredge surveys conducted by the contractor will be verified by the Employer.

The works consist of the maintenance dredging of the berth, basins and approaches in the Port of Dover. The primary scope of works is the restoration of advertised depths within the Inner Harbour, Outer Harbour and the Eastern Docks. Dredging shall be carried out by trailing suction hopper dredger only. Bed levelling is also permitted. The sediment sample test results classify the sediment as the fine sandy silt.
With respect to disposal, material from the Port of Dover can only be placed at the designated offshore disposal site, DV010.
Any navigation beacons which have to be removed in connection with the Contract will be removed and re-established by the Contractor.
Pre-dredge surveys to be carried outby Employer using a multi-beam echo sounder, resulting in near total seabed coverage, intermediate or during dredge surveys conducted by the contractor will be verified by the Employer.
Download full details as .pdf
The Buyer:
Dover Harbour Board
Additional information:
Link:
Download Full Notice as PDF
Link:
View Notice Source
CPV Code(s):
98360000 - Marine services