Rope Access- Buildings Inspection Surveys and Repairs | Tenderlake

Rope Access- Buildings Inspection Surveys and Repairs

Contract Value:
GBP 2M -
Notice Type:
Contract Notice
Published Date:
05 March 2024
Closing Date:
08 April 2024
Location(s):
UKM SCOTLAND (UK UNITED KINGDOM)
Description:
Service provider needed for annual high-level building inspections, including drone and thermal imagery surveys, and planned repairs work on external building elements over a 5-year period.
Rope Access- Buildings Inspection Surveys and Repairs.
Building Inspection Surveys and Repairs

The service provider will be expected to deliver a programme of planned high level tactile inspections of its multi storey blocks, using the rope access method (Mast Climbers or Cradles are not an option). We may also require the service provider to carry out drone survey inspections and thermal imagery inspections upon request. Service providers must be able to provide this requirement should it be necessary.
The Landlord survey inspections will be carried out annually on a percentage of blocks on a rolling program basis over 5 years. Service Providers must be able to carry out a minimum of 27 block inspections per annum. Flexibility of approach will be a requirement by the service provider. Prioritisation of blocks and the frequency of the inspection regime for individual blocks will be agreed between Wheatley Group and the appointed service provider in line with Wheatley Group business needs throughout the contract period.
Certain key triggers could determine frequency, including but not limited to:
Height of blocks e.g. Number of storeys
Location e.g. Exposed location
Known condition e.g. localised blemishes, staining, weathering
Identified issue(s) after inspection e.g. required maintenance etc
The survey and inspection, including high resolution digital photographs, has to cover the external envelope and external fabric of blocks including but not limited to;
External Wall Insulation (EWI)
Rain Screen Cladding (RSC)
Other wall finishes
Roofing
Lightning Protection
Plant, tank, lift motor rooms and drying areas (housing -where situated on roof of MSF)
Roof Edge, Parapet walls and capping
Exposed areas of the structure
Walkways and screens; floors, walls, ceiling, balustrades, frames (considered open to the outside elements)
Windows and Doors
Expansion Joints
Structural openings
Sealants
Balconies; external enclosures, floors, walls, ceiling, balustrades, frames
Flashings
Canopies
External ground floor including bin areas, bulk areas, office areas
Repairs Work
The service provider will be expected to deliver a programme of planned repairs work.
This will include but not limited to:
Breaking out and repairing concrete.
Cutting out and repairing render
Painting of external render
Installation of render boards
Mortar and sealant repairs
Resecuring metal/capping at high level
Download full details as .pdf
The Buyer:
The Wheatley Housing Group Limited
Additional information:
Link:
View Notice Source
Link:
Download Full Notice as PDF
CPV Code(s):
71315400 - Building-inspection services