The permit holder must recharge and reprofile the switches and crossings of the Soléa tramway. In 2023, the total number of switches and crossings to be recharged on the market is 10. The work will be coordinated with Soléa, which will also replace 19 needles, off-market.
m2A and Soléa will define the future work according to the result of the preventive measures carried out, the holder will be informed during the possible renewal of the contract.
The permit holder must recharge and reprofile the switches and crossings of the Soléa tramway.