Trockenbauarbeiten
New suspended ceilings made of plasterboard on the one hand and metal cassettes on the other are to be installed inside the building.
In addition, various drywall and cases are required.
The existing floors were mostly demolished down to the rough ceiling/wooden beams. The rough ceilings are prepared on the basis of the specific installation situations for the installation of the dry screed boards.