Design of the detailed design, construction and installation, as well as operation and maintenance, for a period of 3 years, of Production Units for Self-Consumption (UPAC), using floating photovoltaic technologies, in the Alqueva Multi-Purpose Project (EFMA)
Limited Tender by Prior Qualification with international publicity - Design of the detailed design, construction and installation, as well as operation and maintenance, for a period of 3 years, of Production Units for Self-Consumption (UPAC), using floating photovoltaic technologies, in the Alqueva Multi-Purpose Project (EFMA)