demolition of existing escape stairs;
Delivery and construction of steel stair tower
demolition of existing tower h= 26 m;
demolition concrete beams 14 pcs. ;
steel structure tower 36 t;
Railing 280 m, expanded metal fillings 153 m2.
Get our periodical newsletter about how sell more to the public sector and how to make the most of Tenderlake.