Construction of a new precipitant station consisting of storage container, filling and dosing station, pipelines, electrical engineering, dismantling of old plant
Storage tank with drip tray, PE piping, dosing technology, all-weather cabinet, electrotechnical equipment (control cabinet construction, programmable logic controller, sensors, cabling, etc.)