Ceiling cladding made of metal fabric, aluminium, approx. 245 m² on the 3rd floor and wall cladding made of expanded metal panels approx. 30 m² on the 6th floor in the Burgsee wing in Schwerin Castle
- Production and assembly of a ceiling cladding made of metal fabric, aluminum, 3rd floor, approx. 245 m²
The fabric cover should be perceptible as a continuous, orthogonal laid fabric with segmental arch-like slight curvature along the longitudinal axis and diamond-shaped "punched out", diagonal joints. The supporting structure of the ceiling consists of on-site mounting rails, which are mounted via threaded rods on flange fasteners of the steel girders. At the nodes of the ceiling modules, nodal plates are attached to the on-site construction by means of threaded rods. The ceiling modules are attached to the nodal plates with torsion springs. At the same time, the nodal plates are used to fasten steel cylinders, which are prepared to accommodate on-site lamps. The ceiling modules are made of metal mesh and circumferential angle frames.
- Production and assembly of a wall covering made of expanded metal panels on the 6th floor, approx. 30 m²
- Wall covering with sound absorption plates, 6th floor, approx. 30 m²