Demolition work for the old stock at the school site in Odelzhausen (BA 3).
For the existing building (approx. 27,000 m
- construction site equipment;
- gutting;
- pollution control;
- demolition work;
- earthworks;
- Loading, transport and disposal of rubble;
- direction;
- asbestos removal;
- decontamination and cleaning work;
- Loading, transport and disposal asbestos and KMF.