The object of the contract is forest management services as defined in Article 6 (1) (1) of the Law of 28 September 1991 on Forests (i.e. Journal of Laws of 2021, item 1275 as of late) covering work in the fields of forest farming and protection, fire protection, logging and breaking of timber and hillings, hunting management, meadow and agricultural management, nursery, seed, sourcing of Christmas trees, maintenance of forest objects and other work in the field of forest management to be carried out in the territory of Rudnik Forest District in the year 2022.The scope of the object of the order includes summary quantities of work in scope et al. resulting from the Annexes to the SWZ. The item of the order was divided into VI parts (“Package”)”. The smallest part of the order is the total range of works described in successively numbered forms.relating to individual parts.Proceedings are carried out in accordance with the rules of Art.139 (1.3-4) of PZP.
Package I /1/ — Forestry: Barce, Zatyki, MazeThe implementation of services in particular concerns: logging, lumber harvesting, forest farming, forest protection, protection of crops, fire protection, hunting, meadow and agricultural management, seed, sourcing of Christmas trees, maintenance of forest facilities and other economic work forestry described in Annexes 3.1.1, 3.2.1, 3.3.1, 3.4.1, 3.5.1 to SWZ.The Contracting Authority shall not allow further division of the procution.Quantities of works (activities) planned to be carried out in the locations concerned (forest addresses) on which the contract object is planned to be carried out under the given The package is pre-emptive and subject to change (both increased and reduced) during the execution of the order. The value of the basic contract /without regard to similar services and the maximum value and reduction and without the contracting authority's own materials) was estimated at: PLN 2 151 552.25 without VAT. Estimated maximum value of point. II.2.6 includes the order of similar services as well as the possibility of completing the order at 120%.
In view of the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new location, as well as pausing the steps indicated in each line of tables describing the subject of the order.
The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to execute the subject of a contract involving subcontractors, the contractor shall be obliged to indicate in his offer the parts of the contract (tangible ranges) the execution of which he intends to entrust to the subcontractor and the subcontractor to the contractor. This indication should be placed on the Offer. In the absence of an indication in the Subcontracting Offer, the contractor will be able to introduce the subcontractor only under the conditions laid down in the Contractor in accordance with Article 95 of the PZP requires employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the activities in the scope of the execution of the contract consisting in the acquisition and retraction of wood raw material, if the performance of these activities consists in the performance of work in the manner laid down in Article 22 (1) of the Act of 26 June 1974 - Labor Code (text: Journal of Laws of 2020 item 1320 as amended).
Package II /2/ — Forestry: Pogoń, ZalesieThe performance of services in particular concerns: logging, lumber harvesting, forest farming, forest protection, protection of crops, fire protection, hunting, meadow and agricultural management, sourcing of Christmas trees, maintenance of forest facilities, maintenance of forest facilities, and other work from the scope of forest management described in Annex Nos 3.1.2, 3.2.2, 3.3.2, 3.4.2, 3.5.2 to SWZ
.The Contracting Authority shall not allow further division of the order. The quantities of work (activities) planned to be performed in the locations concerned (forest addresses) where the contract object is planned under the Package is pre-emptive and may change (both increase and decrease) during the execution of the order. The Contracting Authority shall require employment by the contractor or subcontractor on the basis of an employment contract of persons performing the activities included in the subject of the contract involving the acquisition and retraction of the wood raw material, if the performance of the work is carried out in the manner laid down in Art. 22 § 1 of the Act of 26 June 1974 - Labor Code (text: Journal of Laws of 2020., item 1320z late). The value of the basic contract /without regard to similar services and the maximum value and reduction and without the contracting authority's own materials) was estimated at: PLN 1 215 107,30 without VAT. Estimated maximum value of point. II.2.6 includes the order of similar services as well as the possibility of completing the order at 120%.
In view of the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new location, as well as pausing the steps indicated in each line of tables describing the subject of the order.
The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to execute the subject of a contract involving subcontractors, the contractor shall be obliged to indicate in his offer the parts of the contract (tangible ranges) the execution of which he intends to entrust to the subcontractor and the subcontractor to the contractor. This indication should be placed on the Offer. In the absence of an indication in the Subcontracting Offer, the contractor will only be able to enter the subcontractor under the terms set out in the contract.
Package III /3/ — Foresting:Borowina, Kopki, ClayThe implementation of services in particular concerns: logging, lumber harvesting, forest farming, forest protection, seed protection, crop protection, fire protection, hunting, meadow and agricultural management, sourcing of Christmas trees, maintenance of forest facilities and other economic work forest, described in Annex Nos 3.1.3, 3.2.3, 3.3.3, 3.4.3, 3.5.3 to SWZ. The Contracting Authority shall not allow further division of the order. The quantities of work (activities) planned to be performed in the locations concerned (forest addresses) where the contract object is planned under the Package is pre-emptive and may change (both increase and decrease) during the execution of the order. The Contracting Authority shall require employment by the contractor or subcontractor on the basis of an employment contract of persons performing the activities included in the subject of the contract involving the acquisition and retraction of the wood raw material, if the performance of the work is carried out in the manner laid down in Art. 22 § 1 of the Act of 26 June 1974 - Labor Code (text: Journal of Laws of 2020, item 1320z late). The value of the basic contract /without regard to similar services and the maximum value and reduction and without the contracting authority's own materials) was estimated at: .2 093 740,93 PLN without VAT. Estimated maximum value of point. II.2.6 includes the order of similar services as well as the possibility of completing the order at 120%.
In view of the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new location, as well as pausing the steps indicated in each line of tables describing the subject of the order.
The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to execute the subject of a contract involving subcontractors, the contractor shall be obliged to indicate in his offer the parts of the contract (tangible ranges) the execution of which he intends to entrust to the subcontractor and the subcontractor to the contractor. This indication should be placed on the Offer. In the absence of an indication in the Subcontracting Offer, the contractor will only be able to enter the subcontractor under the terms set out in the contract.
Package IV /4/ — Forestry: Black Forest, CausewaysThe performance of the services in particular concerns: nursery and seed, meadow and agricultural management and others described in Annex 3.4 to SIWZ.The Contracting Authority shall not allow further division of the contract. The quantities of works (activities) planned to be performed in the given locations (forest addresses) on which the execution of the object of the contract is planned under the particular Package is preliminary and subject to change (both increased and reduced) during the execution of the order. basic procurement /without regard to similar services and maximum value and reduction and without the contracting authority's own materials) was estimated at: PLN 1 212 444,24 without VAT. Estimated maximum value of point. II.2.6 includes the order of similar services as well as the possibility of completing the order at 120%.
In view of the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new location, as well as pausing the steps indicated in each line of tables describing the subject of the order.
The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to execute the subject of a contract involving subcontractors, the contractor shall be obliged to indicate in his offer the parts of the contract (tangible ranges) the execution of which he intends to entrust to the subcontractor and the subcontractor to the contractor. This indication should be placed on the Offer. In the absence of an indication in the Subcontracting Offer, the contractor will only be able to enter the subcontractor under the terms set out in the contract. The Contracting Authority in accordance with Article 95 of the PZP shall require employment by the Contractor or subcontractor on the basis of the working relationship of persons performing the procurement and retraction of the wood material, if the performance of these activities consists in the performance of the work in the manner of referred to in Article 22 (1) of the Act of 26 June 1974 - Labour Code (text: Journal of Laws of 2020 item 1320 as amended).
Package V /5/ — complex nurseryThe performance of services in particular concerns: nursery and seed, meadow and agricultural management and others described in Annex 3.5 and in.to SIWZ.The Contracting Authority shall not allow further division of the contract. The quantities of works (activities) planned to be performed in the given locations (forest addresses) on which the execution of the object of the contract is planned under the particular Package is preliminary and subject to change (both increased and reduced) during the execution of the order. basic procurement /without regard to similar services and maximum value and reduction and without the contracting authority's own materials) was estimated at a amount:528 268,15 PLN without VAT. Estimated maximum value of point. II.2.6 includes the order of similar services as well as the possibility of completing the order at 120%.
In view of the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new location, as well as pausing the steps indicated in each line of tables describing the subject of the order.
The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to execute the subject of a contract involving subcontractors, the contractor shall be obliged to indicate in his offer the parts of the contract (tangible ranges) the execution of which he intends to entrust to the subcontractor and the subcontractor to the contractor. This indication should be placed on the Offer. In the absence of an indication in the Subcontracting Offer, the contractor will only be able to enter the subcontractor under the terms set out in the contract.
Package VI /6/ — Pre-Soil PreparationThe performance of services in particular concerns: nursery and seed, meadow and agricultural management and others described in Annex No 3.6 and in.to SIWZ.The Contracting Authority shall not allow further division of the contract. The quantities of works (activities) planned to be performed in the given locations (forest addresses) on which the execution of the object of the contract is planned under the particular Package is preliminary and subject to change (both increased and reduced) during the execution of the order. basic procurement /without regard to similar services and maximum value and reduction and without the contracting authority's own materials) was estimated at amount:214 748,65 PLN without VAT. Estimated maximum value of point. II.2.6 includes the order of similar services as well as the possibility of completing the order at 120%.
In view of the actual natural weather situation that may occur during the execution of the subject of the contract, as well as the economic and economic situation unforeseen at the moment, the Contracting Authority reserves the right to make reductive adjustments, enhancement adjustments, new location, as well as pausing the steps indicated in each line of tables describing the subject of the order.
The Contractor may entrust the execution of elements (parts) of the object of the contract to subcontractors In the event of an intention to execute the subject of a contract involving subcontractors, the contractor shall be obliged to indicate in his offer the parts of the contract (tangible ranges) the execution of which he intends to entrust to the subcontractor and the subcontractor to the contractor. This indication should be placed on the Offer. In the absence of an indication in the Subcontracting Offer, the contractor will only be able to enter the subcontractor under the terms set out in the contract.