DESY system floor, new CTA Science Data Management Centre
- hollow floor on steel column construction
- Cutout for floor tank
- Manufacture installation openings
- edge insulation strips
- foreclosure floor cavity
- Floor edge strips on facade
- raised floor with linoleum
- working on raised floors in door recesses and hollow floor surfaces
System floor for the construction of a new Science Data Management Centre (SDMC) for the Cherenko Telescope Array (CTA) and a canteen.
The structure, consisting of a flat base building and an office bar arranged above and partly projecting above it.
Two identical upper floors, a ground floor and a partial basement. The office workstations of the CTA SDMC are located on the upper floors, while the meeting room, the canteen with dining room with adjoining rooms (kitchen) and central building services areas (e.g. ventilation center) are located on the ground floor.
The building is accessed via two staircases and a lift.
The gross floor area of all levels is approximately 2,800 m².
The building exterior dimensions are approximately 28.5m x 43.0m for the EC body and approx. 17.5m x 44.5m for the OG body. The storey heights are approximately 4.40m for the ground floor and 3.15m for the 1st and 2nd floors respectively.
The following services are intended for the allocation of system flooring:
- hollow floor on steel column construction
- Cutout for floor tank
- Manufacture installation openings
- edge insulation strips
- foreclosure floor cavity
- Floor edge strips on facade
- raised floor with linoleum
- working on raised floors in door recesses and hollow floor surfaces