The Aachen Center for Timber Research (AZH) of the Aachen University of Applied Sciences is being built at 52152 Simmerath. This is a new research center that will develop and optimize innovations for resource-efficient and climate-friendly building with wood.
The project is funded by the European Union (European Regional Development Fund (ERDF) 2014-2020, “Investment in Growth and Employment”, ERDF funding code: EFRE-0500064) and is funded by the state of North Rhine-Westphalia.
For Forschungszentrum Jülich, the following equipment / products are to be procured to equip the laboratory, which will be put out to tender divided into eight lots:
—
Binding delivery date:
Delivery of equipment / products of all lots:
End of July 2023
(for further details see service description)
It is possible to submit bids on individual lots or all lots.
The tender takes place in the open procedure according to VgV under the conditions stated in this tender and the offer documents.
Lot 1: various operating equipment, shelves, ladders, scaffolding, occupational safety requirementsList of services lot 1 (extract):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 1:
Item 2.1.1 Pallet racking system, quantity: 1 piece
Item 2.1.2 Steel panel for pallet rack, quantity: 120 pieces
Item 2.1.3 Plug-in shelving system, quantity: 1 piece
Item 2.1.4 Gullwing door cabinet, quantity: 2 pieces
Item 2.1.5 Transport and stacking containers (1), quantity: 4 pieces
Item 2.1.6 Transport and stacking containers (2), quantity: 4 pieces
Item 2.1.7 Transport and stacking containers (3), quantity: 4 pieces
Item 2.1.8 Lattice box, quantity: 10 pieces
Item 2.1.9 Platform ladder, quantity: 1 piece
Item 2.1.10 Step ladder, quantity: 2 pieces
Item 2.1.11 Mobile scaffolding, quantity: 1 piece
Item 2.1.12 Sling chains (1), quantity: 2 pieces
Item 2.1.13 Sling chains (2), quantity: 2 pieces
Item 2.1.14 Lashing strap (1), quantity: 5 pieces
Item 2.1.15 Lashing strap (2), quantity: 5 pieces
Item 2.1.16 Round sling (1), quantity: 4 pieces
Item 2.1.17 Round sling (2), quantity: 4 pieces
Item 2.1.18 Edge protector, quantity: 8 pieces
Item 2.1.19 Euro pallet, 4 pieces
Item 2.1.20 Ear, quantity: 20 pieces
Item 2.1.21 Storage box ear, quantity: 5 pieces
Item 2.1.22 Earplug dispenser, quantity: 1 piece
Item 2.1.23 Safety goggles, quantity: 10 pieces
Item 2.1.24 Storage box safety goggles, quantity: 4 pieces
Item 2.1.25 Fall protection (1), quantity: 4 pieces
Item 2.1.26 Cantilever rack (1), quantity: 1 piece
Item 2.1.27 Cantilever rack (2), quantity: 1 piece
Item 2.1.28 Changing locker, quantity: 2 pieces
—
For more specifications on Lot 1, see the Lot 1 Specifications.
Lot 2: ALU working and protective scaffoldList of services lot 2 (extract):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 2:
Item 2.2.1 ALU working and protective scaffold
Quantity: 1 piece
—
For further specifications on Lot 2, see the Lot 2 specifications.
Lot 3: Laboratory equipment small partsList of services lot 3 (excerpt):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 3:
Item 2.3.1 Ball cable ties, quantity: 100pcs
Item 2.3.2 Magnetic cable holder, quantity: 20pcs
Item 2.3.3 Hook magnet, quantity: 10 pieces
—
For further specifications on Lot 3, see the Lot 3 specifications.
The 4: GegengewichtskranSpecifications Lot 4 (excerpt):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 4:
Item 2.4.1 Counterweight crane, quantity: 1 piece
—
For further specifications for Lot 4, see Lot 4 SOW.
The 5: PräzisionswaageSpecifications Lot 5 (excerpt):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 5:
Item 2.5.1 Precision balance 5.2 kg Quantity: 1 piece
—
For further specifications for Lot 5, see Lot 5 SOW.
Lot 6: additional scalesSpecifications Lot 6 (excerpt):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 6:
Item 2.6.1 Scale 30 kg Quantity: 1 piece
Item 2.6.2 Scale 60 kg Quantity: 1 piece
Item 2.6.3 Scale 150 kg Quantity: 1 piece
Item 2.6.4 Scale 200 kg Quantity: 1 piece
Item 2.6.5 Digital crane scale quantity: 1pcs
—
For further specifications for Lot 6, see Lot 6 SOW.
The 7: GefahrstoffschränkeSpecifications Lot 7 (excerpt):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 7:
Item 2.7.1 Hazardous materials cabinet flammable substances,
Quantity: 1 piece
Item 2.7.2 Hazardous substance cabinet water-fed. Substances
Quantity: 1 piece
—
For further specifications for Lot 7, see Lot 7 SOOS.
Lot 8: Stacking tipper with accessoriesSpecifications Lot 8 (excerpt):
Binding delivery date:
End of July 2023
(for further details see service description)
--------------------------------------------------------------
Equipment to be supplied for Lot 8:
Item 2.8.1 Stacking tipper, quantity: 6 pieces
Item 2.8.2 Lid for stacking tipper, quantity: 3 pieces
Item 2.8.3 Tilting traverse for stacking tippers, quantity: 1 piece
—
For further specifications on Lot 8, see Lot 8 SOOS.