This list of services includes the services for the redesign of the event areas in the Kurpark:
- B17.2 Kurpark Renewal of paths and lighting,
- A9.2 Kurpark Renewal of the fountain area,
- A9.2 Kurpark Mühlenteich seating area,
- B1.3 Kurpark Kneipp area,
- Kurpark SW drainage points and lines.
Civil engineering, concrete and road construction work must be carried out for the production of the outdoor facilities.
earthworks:
1 100 m
- 9 100 m
- 1 300 m
- Deliver and install 77 m³ of tree substrate, FLL construction method 2,
- 10 350 m
- supply and manufacture 213 m of 3-row paving rows,
- supply and manufacture 273 m 3-row plaster basin,
- Delivery and installation of 80 m of concrete blocks,
- Make 190 m edging from steel strip 6/100 mm.
Sewage systems:
- 700 m
- Deliver and install 580 m of cable protection pipe DN 110,
- Delivery and installation of 74 m of cable protection pipe DN 160,
- 90 m sewer construction work including sheeting,
- Delivery and installation of 320 m plastic pipes PP up to DN160,
- delivery and installation of 200 m water pipe PE100, DA63x5,8,
- Deliver and install 5 underground hydrants.
Internals:
- Pick up 8 bench seats from Bauhof AG and install them,
- Deliver and install 16 grating 500 x 1,000 mm as scratch protection,
- Pick up and install 2 waste bins from Bauhof AG,
- Deliver and install 1 piece Willibrodrus fountain basin made of exposed concrete,
- 300 m
- 55 m
- 250 m
- 55 m
Demolition:
- 800 m
- 250 m
- Break off and dispose of 300 m curb stone made of concrete stone,
- Demolish and dispose of 140 m curb stone made of natural stone,
- 140 m
- Break off and dispose of 110 m metal railing / fall protection.