The purpose of this framework agreement is to define the nature and consistency of the work commissioned by the Town of Trappes
masonry - tiles - false ceilings - platingmaximum amount: 800,000 euro(s) (excl. VAT).
blindsMaximum amount: 150,000 euro(s) (excl. tax).
ELECTRICITYMaximum amount: 600,000 euro(s) (excl. tax).
plumbing - ventilation - air conditioningMaximum amount: 600,000 euro(s) (excl. tax).
Joinerymaximum amount: 250,000 euro(s) (excl. VAT).
carpentry - steel - aluminium - pvc - locksmithMaximum amount: 600,000 euro(s) (excl. tax).
Paint -Soft floorMaximum amount: 350,000 euro(s) (excl. tax).
BlanketMaximum amount: 150,000 euro(s) (excl. tax).
WATERPROOFINGMaximum amount: 350,000 euro(s) (excl. tax).
glazieryMaximum amount: 60,000 euro(s) (excl. VAT).