The project consists of the rehabilitation and extension of the existing rowing club hangar. The existing hangar was rehabilitated into a house of associations. The extensions are located on either side of the existing hangar and will house the rowing and cycling house. The entire plot is landscaped with a car park with 24 spaces, 66 bicycle parking spaces, a forecourt dedicated to washing the club's boats, a pump track, a children's play area and a street work out area. The floor area of the sports centre is 760 square metres
Asbestos removal-DeconstructionThe asbestos removal and deconstruction work will take place in 2 phases:- phase 1: asbestos removal of the western part of the building and cleaning of the changing rooms, reception, weight room. Note/ Maintaining access and occupancy of the boat garage and adjacent storage facilities.- Phase 2: Asbestos removal & Deconstruction of the rest of the buildingFloor area: 760 square meters
Soft floorsSports PVC flooring, linoleum flooring in broadlooms etc
Hard floors-earthenwaretiles, earthenware, cement screed, etc
Paintingwall painting, ceiling painting, terminal cleaning, anti-dust floor painting etc
HVAC-Plumbing-SanitaryHeating, Ventilation, Cooling and Plumbing Sanitary installations etc
electricity high currents - low currentsCfo and CFA electricity installations
Various network roadsearthworks, wastewater, rainwater, various networks, drinking water network, floor coverings (deactivated concrete, sand, mulch etc.), masonry (gabion wall, retaining wall etc), wind turbine, various furniture etc
Dry networksHigh current, lighting (light tower) etc
Green spaceslandscaping, planting (trees, shrubs, perennials, etc.), grass cover (meadows) etc
Big workmechanical earthworks, walls and shielding, foundations, paving, vertical infrastructure, waterproofing of underground structures, networks and pipes, etc
Wood and metal frameglulam frame, steel frame, timber frame walls
Blanketroofs, canopies, finishing and finishing works, rainwater drainage, etc
Facades-Claddingfacades, metal and translucent cladding, finishing works, etc
Wood exterior joineryexterior joinery, hardware, accessories and accessories, exterior and interior sun protection, etc
Locksmithsectional doors, sliding doors, metal stairs and ladders, railings, metal handrails and handrails, etc
Partitions-doublings-false ceilingsThermal lining in wood wool on frames, distribution partitions, suspended ceilings, suspended ceilings, etc
Interior joineryDoor blocks, partitions, various fittings, interior signage, etc