Carpentry work (built-in furniture).
new building:
- 12 cloakrooms with bench,
- 96 shelves for classrooms,
- 16 bench elements for classrooms,
- 185 m
- 4 fitted kitchens (identical in construction).
Duration:
- 25 x wall cladding splash protection washbasin,
- 6 x radiator panels as a bench.