As a secondary school, the Europaschule is part of the Gestfeld school centre, which also includes a primary school. The location has in different
Construction phases experience various extensions. The original school building was built in the sixties of the previous century.
, the last new building on the site was built in 2019.
For this reason, the specialist office has prepared a feasibility study in which the space requirements as well as other design and pedagogical parameters are clarified.
and a budget. The results of this feasibility study will now serve as a basis for further planning. Due to the
in the meantime changed requirements for the space program, as well as the already completed implementation of the 1st construction phase for the extension
of the European School, however, the study serves only as an orientation
The new building is not only intended to accommodate the rooms typical of a school canteen, such as the kitchen and dining room, etc. but also two other
Classrooms, according to the requirements of an inclusive school.
In the course of the new building, the current canteen will be dismantled, whose premises will be available as classrooms again in the future.
should.
The planning is to be based on the Cologne school building guideline with its specifications for use and space. In a target/actual comparison, the space deficits of the inventory were mapped as part of the feasibility study and solutions for optimization were developed. Aspects such as design, pedagogy and building operation should ideally be considered equally.
Structural design (LP 1- 6 acc. to HOAI) for the new canteen of the European School
The planning services for the object planning are awarded to an architectural or engineering office in a VgV procedure. The services for specialist planning ARC and TGA are also put out to tender in VgV procedures.