Main measure operational equipment
In the context of the construction of the escape tunnel and the retrofitting according to the RABT 2006 standard of the
Burgbergtunnel near Bernkastel
Extensive retrofits are planned as part of the main measure for the complete operational upgrading of the Burgberg tunnel.
- tunnel lighting,
- tunnel ventilation system,
- Sensor system tunnel air quality,
- sensor flow velocity of the tunnel air,
- tunnel barrier,
- guide lighting,
- escape route marking / emergency lighting,
- emergency stations,
- video surveillance,
- BOS radio coverage,
- public address system,
- fire alarm system,
- Power supply,
- conversion of low-voltage switchgear,
- spare power supply,
- electrical installations,
- control cabinets,
- process control,
- control technology - process visualization,
- portal control,
- double floor,
- rescue bar ventilation,
- Sub-works.
To name here are essentially:
- construction of handrails in the area of special temporary areas,
- erection of a handrail in the rescue tunnel (one-sided execution),
- construction of fire-resistant closures,
- clearing in the area of the radio cable route in the outer area at the West Portal,
- earthwork for the establishment of free field,
- control cabinets and the portal barriers,
- Dismantling of the prov. Cabling of the preliminary measure.