works as part of the extension and rehabilitation of the headquarters of the Caisse d'assurance Retraite et de Santé au Travail Centre Ouest. The market is broken down into slices, one farm and two optional. Estimated contract duration 53 months
earthworks-vrd-signage-green spaceLandscaped spaces to be created, directional signage and mass earthworks, particularly for the Transport Access Zone
Interior joinery and furnitureconcerns all buildings with modernization of the spaces of the extension and the rehabilitated buildings
platrerie-insulation-false ceilingsconcerns all existing and created buildings
Agrifood partitionsconcerns the extension (the kitchen and its technical rooms)
soft coatingsSoils for the rehabilitation of existing buildings mainly
resin coatingsfloors of the culinary product part only in the company restaurant
ceramic coatingsmainly in sanitary areas with wall protection
painting-wall coverings-cleaningconcerns all existing and created buildings
ELECTRICITYconcerns all existing and created buildings - low current and high current
Heating-Ventilation-Plumbing SanitaryTotal overhaul of the elements in the extension and the existing building
Kitchen Equipmentsconcerns the extension only. A maintenance service of the installations is planned for a period of 12 months on the equipment and supplies, from the actual commissioning of the installation or the date of lifting of the reserves if it is later.
ASBESTOSexhaustive asbestos removal according to Asbestos Identification Before Work
Elevators-platform platform platformCreation of 1 elevator duplex + 1 freight elevator in the extension + 1 freight elevator to be modernized Building A + Modernization of an elevator Building C
demolitions-special foundations-structural workDemolition existing walkway between buildings A and C, foundations, posts and vertical connection of the company canteen. Creation communication core built between A and C on the height of A
Metal framethe Extension is in metal structure for the company restaurant part (Warren beams, floors and frame)
renovation - itethe facades of the existing building with installation of thermal insulation from the outside for building C and vertical connection between A and C
cladding - covermainly concerns the extension of the Work Café building
WATERPROOFINGconcerns all existing buildings and created in high terraces and roofs
locksmithing and metalworkconcerns all existing and created buildings
Exterior joinery-blackoutAll exterior joinery and existing shutters are to be replaced